AbbVie

Operations Intern - Global Facilities Engineering
--

Accomplishments

Calculated air volume ranges, velocity, and pressure for laboratory HVAC system based on exhaust requirements and duct sizing, demonstrating need for a 35% increase in air supply

Developed construction documents guiding removal of three non-operational air handling units and utilities, freeing 500+ sq. ft. for system upgrades

Verified and updated HVAC systems drawings to reflect field conditions, converting 12 outdated manual drawings into revised digital formats to be utilized in remodeling and upgrading of laboratories

Designed and developed detailed construction documents for an HVAC controller testing area, enabling evaluation of control schemes prior to implementation